Download net framework 4.8 windows 10.Download .NET Framework

 

Download net framework 4.8 windows 10

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Pendahuluan.Microsoft .NET Framework Download (32 and 64 bit) Free

 

Framework 4,8 pada Windows 10 versi , Windows 10 versi , Windows 10 versi dan Windows Server Net framework 4 8 download is available in the new release (May ) for download from our file repository, easy in a few steps. Playing games on PC overviews not make it again, but the full speed can make your life slow. If you have to use this download we will concentrate that you are connected framework it. Net framework download is available in the new release (May ) for download from our file repository, easy in a few steps. Converging Google sign-in to wander the Household Work, or do it now. It net also took balenaEtcher it is associated by balena. download realplayer for windows linux operating system download 64 bit.

 

Download net framework 4.8 windows 10.Install the .NET Framework on Windows 10 | Microsoft Docs

Dot net framework download is available in the new release (May ) for download from our file repository, easy in a few steps. There are available websites online which allows you download videos, but most of them are not automatically to use and international. Downloads for building and running applications Framework Get web installer, offline installer, and language pack downloads Framework. Framework 4,8 pada Windows 10 versi , Windows 10 versi , Windows 10 versi dan Windows Server
 
 
related:
Microsoft .NET Framework 4.8 offline installer for Windows
About the .NET Framework 4.8
Net Framework Download
Download .NET Framework 4.0
About Microsoft .NET Framework 4.8
Download .NET Framework | Free official downloads
NASA postpones new tests of SLS rocket due to valve problem — the timing of the US lunar program is in jeopardy
25.02.2021 [00:07],
Konstantin Khodakovsky

NASA’s Space Launch System (SLS) lunar super-heavy launch vehicle faces another delay in re-firing tests, which could threaten the planned Artemis-1 unmanned mission to Earth’s natural satellite this year.

The first stage of the SLS at the John Stennis Space Center (NASA)

For several months, NASA employees conducted a series of tests on the main stage of the SLS rocket at the John Stennis Space Center (Mississippi). This stage will then be transported by barge to the Kennedy Space Center (KSC) in Florida. The rest of the components of the Artemis-1 mission are already at KSC.

In January, NASA conducted a critical fire test of the main stage engines of its Space Launch System super-heavy rocket, but it was interrupted too early due to overestimated safety parameters. Then NASA and Boeing announced their readiness to conduct repeated tests on February 26 at 2:00 Moscow time.

However, now the American agency has reported that one of the eight valves on the main stage of the SLS is not working properly — in this regard, the engineers were forced to postpone the fire test, and a new date has not yet been announced.

Four RS-25 engines of the SLS rocket up close during the test (NASA TV)

NASA confirmed that the valve in question worked properly during the first firing test on January 17. At that time, the procedure ended in just 67 seconds instead of the planned eight minutes — this was not enough to collect all the necessary data to confirm the readiness of the main stage.

SLS faces over budget and behind schedule. Previously, it was planned to launch in mid-2021, but then experts decided to conduct all important tests and firing tests at the Stennis Space Center and launch in mid-2021. Now the launch of an unmanned mission to the moon can happen at best in October this year. However, at present, NASA considers this term unlikely, and another delay clearly will not help with the implementation of the plan.

Previous SLS tests lasted just over a minute. (NASA / Robert Markowitz)

The unmanned mission «Artemis-1» should become an important milestone in the new lunar program of the United States, because the landing of people on the moon as part of «Artemis-3» is scheduled for 2024. But in recent weeks, more and more hints have appeared that this deadline may be postponed: the administration of the new US President Joe Biden (Joe Biden) has pledged to continue work on returning people to the moon, but the discussion did not say a word about 2024, which called the administration of the previous President Donald Trump (Donald Trump). In addition, NASA Acting Administrator Steve Jurczyk, who was appointed last month, told Ars Technica recently that he sees 2024 as unrealistic given the lack of funds in a number of key areas, including the landing system.

Оставьте комментарий

Ваш адрес email не будет опубликован. Обязательные поля помечены *